行業(yè)資訊
冷再生機的相關施工要求
來源:http://hk-pinyan.cn/ 日期:2023-03-15
冷再生機是一種高效率、多用途的施工機械。主要用于公路、城鄉(xiāng)道路、機場、碼頭、停車場等工程的基層、底層穩(wěn)定土現(xiàn)場就地拌和作業(yè)。今天冷再生機租賃公司就為大家介紹一下冷再生機的施工要求有哪些。
The cold regenerator is a high-efficiency and multipurpose construction machine. It is mainly used for on-site mixing of base and bottom stabilized soil in highway, urban and rural roads, airports, docks, parking lots and other projects. Today, the cold regenerator leasing company will introduce the construction requirements of the cold regenerator.
1、使用冷再生機施工前要調(diào)好水泥漿的稠度并拌合均勻,水泥漿中的雜質(zhì)和硬塊應用濾網(wǎng)濾出,以免堵塞噴嘴;事先調(diào)試好噴嘴的噴漿量,以保證水泥劑量準確。
1. Before using the cold regenerator for construction, the consistency of the cement slurry shall be adjusted and mixed evenly. The impurities and hard lumps in the cement slurry shall be filtered out by the filter screen to avoid blocking the nozzle; Adjust the spray quantity of the nozzle in advance to ensure the accurate cement dosage.
2、開始施工時速度不要太快,為滿足設計和質(zhì)量要求,要經(jīng)常檢查拌合的均勻情況和深度,發(fā)現(xiàn)與設計有差異時要及時調(diào)整。
2. The construction speed should not be too fast at the beginning. In order to meet the design and quality requirements, the uniformity and depth of mixing should be checked frequently, and the difference with the design should be adjusted in time.
3、作業(yè)施工水罐車停車時一定要離開已施工或待施工水泥已攤鋪路面,以防止漏水引起的局部水大。
3. When the construction water tank truck stops, it is necessary to leave the paved cement pavement that has been constructed or to be constructed to prevent local water leakage.
4、施工車輛停放時一定要錯開第二天的第一段第一道預工作面,以防止耽誤第二天的人工水泥攤鋪。
4. When parking construction vehicles, the first pre-working surface of the first section of the next day must be staggered to prevent delaying the manual cement paving of the next day.
5、避免犯"過壓"的錯誤,即過度壓實。若達到材料的最大密實度后仍然繼續(xù)碾壓,則會破壞材料,反而降低其密實度。
5. Avoid the mistake of "over compaction", that is, over compaction. If rolling continues after reaching the maximum compactness of the material, it will destroy the material and reduce its compactness.


6、冷再生機的施工作業(yè)應該在每天下午15:00-16:00之間結(jié)束,以便后續(xù)施工能在天黑前結(jié)束。
6. The construction of the cold regenerator should be completed between 15:00-16:00 every afternoon, so that the subsequent construction can be completed before dark.
7、每天冷再生機結(jié)束施工進行洗刀停車后,應通知操作手仔細檢查車況并更換刀頭,以免耽誤第二天的施工進度。
7. After the construction of the cold regenerator is finished and the cutter is washed and stopped every day, the operator should be notified to carefully check the vehicle condition and replace the cutter head to avoid delaying the construction progress of the next day.
8、冷再生機拌合過程中要經(jīng)常檢查拌合機刀頭的磨損情況和水泥漿車的噴嘴,刀頭磨損嚴重要及時更換,噴嘴發(fā)生堵塞要及時疏通。
8. During the mixing process of the cold regenerator, the wear of the cutter head of the mixer and the nozzle of the cement slurry truck should be regularly checked. The cutter head should be replaced in time if it is seriously worn, and the nozzle should be unblocked in time if it is blocked.
9、冷再生機拌合時將整個半幅分成3次拌合,用完水泥漿車內(nèi)已知重量水泥后,核算已經(jīng)作業(yè)的面積與水泥消耗是否相符,及時做出調(diào)整。作業(yè)結(jié)束,放出剩余水泥漿。
9. When mixing with the cold regenerator, the whole half is divided into three times. After using up the known weight of cement in the cement slurry truck, check whether the area that has been worked is consistent with the cement consumption, and make adjustments in time. At the end of the operation, discharge the remaining cement slurry.
以上就是小編整理的關于冷再生機施工要求的介紹,希望對您使用冷再生機有所幫助。更多關于該設備以及設備租賃的事項就來我們網(wǎng)站http://hk-pinyan.cn進行咨詢了解吧!
The above is the introduction about the construction requirements of the cold recycling machine compiled by Xiao Bian, hoping to help you use the cold recycling machine. For more information about the equipment and equipment leasing, please visit our website http://hk-pinyan.cn Consult and understand!